Global Business in Iran Database
In-depth metrics and analysis of Iran's international economic partnerships.
GS Engineering - OIEC, South Pars Phases 9 & 10 Completion
description
The much delayed project to develop South Pars Phases 9 and 10 is nearing completion as LPG storage tanks have come online, and Iran has recently begun shipping refined sulfur products from the facility as well. The sulfur was exported to China. South Korea's GS is cooperating with Oil Industries Engineering Company (OIEC) and Iranian Offshore Engineering & Construction Company (IOECC). Phases 9 and 10 were inaugurated in March 2009.
- Country: South Korea
- Client: Oil Industries Engineering Company (OIEC) and Iranian Offsho
- Contractor: GS Engineering & Construction Co.
Status
- Current Status:
- Discussion Date:
- Contract Date:
- Completion Date:
Citation
1. "Iran: LPG tanks operational at South Pars gas field", Press TV, September 28, 2009, available http://www.presstv.ir/detail.aspx?id=107311§ionid=351020103.
2. "Iran exports sulfur from phases 9, 10 of South Pars", Press TV, 21 September 2009, available at http://www.presstv.com/detail.aspx?id=106713§ionid=351020103.
3. "IRAN: Despite sanctions, business as usual.", LA Times, 15 March 2009. Available at http://latimesblogs.latimes.com/babylonbeyond/2009/03/iran-despite-sa.html.
4. "South Korea's GS Engineering completes $2.1b gas plant in Iran", Tehran Times, 17 March 2009, Available at http://www.tehrantimes.com/index_View.asp?code=191187.
All projects by GS Engineering & Construction Co.
|
// Remove pagination parameters from header links; they want to reset
// to page 1 when resorting columns.
$label = preg_replace('/\&page=\d*?/', "", $label);
?>
Country |
// Remove pagination parameters from header links; they want to reset // to page 1 when resorting columns. $label = preg_replace('/\&page=\d*?/', "", $label); ?> Contractor | // Remove pagination parameters from header links; they want to reset // to page 1 when resorting columns. $label = preg_replace('/\&page=\d*?/', "", $label); ?> Project Name | // Remove pagination parameters from header links; they want to reset // to page 1 when resorting columns. $label = preg_replace('/\&page=\d*?/', "", $label); ?> Amount (Current Dollar Value) | // Remove pagination parameters from header links; they want to reset // to page 1 when resorting columns. $label = preg_replace('/\&page=\d*?/', "", $label); ?> Last Action | // Remove pagination parameters from header links; they want to reset // to page 1 when resorting columns. $label = preg_replace('/\&page=\d*?/', "", $label); ?> Status | ||
|---|---|---|---|---|---|---|---|
| GS Engineering & Construction Co. | GS Engineering - OIEC, South Pars Phases 9 & 10 Completion | $2.1 billion |
09/28/09 |
---- | |||
| GS Engineering & Construction Co. | GS Engineering & Construction - Pars Oil and Gas Co., South Pars 6, 7, 8 | $1.83 billion |
07/01/10 |
---- |